| 1 | Fixed-Mounted ACB | Installation method | Overload, short-circuit, and ground-fault protection when equipped with a suitable trip unit; manual or motorized operation may be available. | Provides permanent protection and switching for circuits that do not require rapid breaker removal. | Main low-voltage switchboards, utility distribution panels, industrial feeders, and transformer secondary connections. |
| 2 | Drawout or Withdrawable ACB | Installation method | The same core overcurrent functions as a fixed ACB, with disconnect, test, and connected positions for safer isolation and maintenance. | Allows inspection, testing, replacement, and maintenance without removing the complete breaker from the switchboard. | Critical facilities, data centers, hospitals, process plants, power generation facilities, and large commercial buildings. |
| 3 | Three-Pole ACB | Number of poles | Simultaneous interruption of all three phase conductors; protection settings may include long-time, short-time, instantaneous, and ground-fault functions. | Protects balanced or predominantly three-phase loads where the neutral does not need to be switched. | Motor control centers, industrial feeders, three-phase transformers, chillers, pumps, and large mechanical equipment. |
| 4 | Four-Pole ACB with Switched Neutral | Number of poles | Switches the three phases and neutral together; may provide neutral-current sensing and ground-fault protection when supported by the trip unit. | Provides complete isolation of three-phase circuits with significant single-phase loading or systems requiring neutral disconnection. | Commercial buildings, hospitals, data centers, generator changeover systems, and installations with multiple nonlinear loads. |
| 5 | Thermal-Magnetic ACB | Trip technology | Thermal action responds to sustained overloads, while magnetic action provides fast response to high short-circuit currents. | Offers straightforward overcurrent protection with simple adjustment and limited dependence on auxiliary power. | Conventional distribution boards, general industrial loads, smaller main incomers, and systems where advanced protection coordination is not required. |
| 6 | Electronic LSI ACB | Trip technology | Long-time protection for overloads, short-time protection with adjustable delay, and instantaneous protection for severe short circuits. | Improves selectivity and setting accuracy compared with basic thermal-magnetic protection. | Main switchboards, large feeders, industrial plants, commercial distribution systems, and transformer protection. |
| 7 | Electronic LSIG ACB | Trip technology | Long-time, short-time, instantaneous, and ground-fault protection, with adjustable pickup and time-delay settings depending on the trip unit. | Protects against overloads, phase-to-phase faults, high-current faults, and many line-to-ground faults. | Industrial plants, high-rise buildings, hospitals, data centers, mining facilities, and low-voltage power distribution systems. |
| 8 | Zone-Selective Interlocking ACB | Coordination feature | Uses communication between upstream and downstream breakers to reduce fault-clearing time while maintaining selective coordination. | Limits the duration and energy of short-circuit faults in the affected zone without unnecessarily tripping upstream breakers. | Mission-critical switchboards, hospitals, airports, high-rise buildings, manufacturing plants, and systems with multiple distribution levels. |
| 9 | Current-Limiting ACB | Fault-current performance | Restricts the peak let-through current and fault energy during a short circuit, reducing thermal and mechanical stress on downstream equipment. | Helps protect busbars, cables, transformers, and switchgear in systems with high prospective short-circuit current. | Industrial power systems, utility substations, large commercial installations, and locations near high-capacity transformers. |
| 10 | Arc-Energy-Reduction ACB | Maintenance and safety function | May use maintenance-mode settings, instantaneous override, remote trip, or other arc-energy-reduction functions to shorten fault-clearing time during servicing. | Reduces the potential incident energy available to personnel working near energized equipment, when correctly designed and operated. | Industrial control rooms, electrical rooms, data centers, utilities, and facilities subject to energized maintenance requirements. |