| Applicable standards | Identify the fire-shutter product standard, building fire code, and approval requirements applicable to the project. For projects in China, check the applicable edition of GB 14102; other jurisdictions may require standards such as NFPA 80 or EN 1634-1. | Approved submittals identify the governing code, standard editions, required fire-resistance classification, and any project-specific conditions. | Designer, code authority, and supplier |
| Fire-resistance rating | Select a shutter assembly with a tested and approved rating suitable for the opening and the building’s fire-compartment design. Ratings and classifications are not interchangeable between standards. | Provide the applicable test or certification documents for the complete assembly and verify that the approved rating matches the project specification. | Designer and supplier |
| Opening survey | Measure the structural opening and check the substrate, headroom, side-room, guides, barrel location, and surrounding construction before installation. | Recorded site measurements and coordinated shop drawings show that the shutter, guides, supports, and clearances fit the actual opening. | Installer and site supervisor |
| Supporting construction | Confirm that the wall, lintel, support brackets, and fixings are suitable for the loads and installation details specified for the approved shutter assembly. | Fixings and supports match the approved drawings and installation instructions; deviations are reviewed and approved before work continues. | Installer and structural designer |
| Guide and curtain alignment | Install guides, barrel, curtain, and bottom bar square, plumb, and in accordance with the assembly instructions. Keep the curtain path clear of services and obstructions. | Visual inspection confirms secure fixings, aligned guides, free curtain travel, and no interference across the full opening. | Qualified installer |
| Fire alarm interface | Connect the shutter to the specified fire alarm or detection system and verify the intended activation sequence, control logic, and any required monitoring. | Cause-and-effect testing confirms that the correct alarm input initiates the specified shutter response and that status signals operate where required. | Fire alarm contractor and commissioning team |
| Power and controls | Install and configure the control panel, power supply, limits, manual controls, and any specified standby or emergency operation in accordance with the approved design. | Electrical checks and functional tests are documented; control settings match the approved instructions and project sequence. | Electrical contractor and installer |
| Commissioning operation test | Run the shutter through its operating cycle using normal controls, then test alarm activation and the specified closure sequence. Check travel, stopping positions, and any safety devices. | The shutter operates without binding or unintended interruption, reaches the specified closed position, and responds to tested inputs as designed. | Installer and commissioning team |
| Closure performance | Measure and record closure behavior when required by the project specification or applicable code. Use the approved criteria; there is no single closure-time value that applies to every installation. | Test records include the trigger, operating mode, observed performance, results, and any required corrective actions. | Commissioning team |
| Handover records | Provide operating instructions, maintenance requirements, approved drawings, test records, and information about permitted replacement parts and adjustments. | The building owner receives a complete handover package and knows how to arrange inspection, testing, and defect reporting. | Supplier and installer |
| Routine inspection | Inspect the curtain, guides, barrel area, bottom bar, controls, indicators, and surrounding opening at intervals required by local rules and the manufacturer’s instructions. | Inspection records note the date, observed condition, defects, and repairs. Keep the shutter path clear and do not alter the assembly without approval. | Building owner or maintenance provider |
| Periodic functional testing | Test operation and fire-alarm activation at the frequency required by the governing code and approved maintenance plan. NFPA 80 commonly requires periodic inspection and testing of fire door assemblies; confirm the applicable provisions for the specific shutter. | Document the test method, activation source, full operating sequence, result, and any corrective work. Retain records for review by the authority having jurisdiction. | Qualified maintenance provider |
| Defect response | Investigate abnormal noise, slow or incomplete travel, damaged slats, loose guides, control faults, or failed alarm response promptly. Do not leave a fire-protection opening impaired without following the site’s impairment procedure. | Repairs are completed by competent personnel, followed by functional testing and an updated maintenance record. | Building owner and qualified service provider |