| Typical bunkering duty | Commonly used for transferring LNG from a vessel or station tank to a receiving vessel, especially where the pump can be installed within the tank or a suitable pump well. | Used for LNG transfer when an accessible, deck-mounted pump arrangement is preferred and the system can support cryogenic suction conditions. | Often considered when LNG must be delivered at higher pressure and comparatively lower flow, such as feeding a downstream high-pressure vaporization system. | Define the receiving vessel’s required transfer rate, delivery pressure, operating sequence, and connection arrangement before selecting a pump family. |
| Operating principle | A centrifugal impeller adds energy to the liquid; the pump is immersed in or closely coupled to the cryogenic liquid. | A centrifugal impeller adds energy to LNG drawn through a suction line; the pump may use a cryogenic mechanical seal or a sealless arrangement. | A reciprocating mechanism displaces a measured volume of liquid on each stroke, producing a pulsating discharge unless mitigated. | Match the pump curve or displacement characteristics to the full operating range, including start-up, minimum flow, and anticipated transfer conditions. |
| Pressure and flow profile | Well suited to steady liquid transfer; achievable flow and pressure depend on the selected stages, speed, and system resistance. | Can provide steady transfer flow; available suction head and seal arrangement are important design constraints. | Can generate higher discharge pressure, typically with lower flow than a large transfer centrifugal pump; discharge pulsation must be considered. | Do not select from a generic flow or pressure range. Confirm the duty point, turndown, differential pressure, and liquid properties with the project process data. |
| Suction and vapor management | Immersion can provide favorable suction conditions, but tank level, submergence, liquid motion, and pump inlet design still require evaluation. | Requires careful suction-line design to limit pressure loss, heat ingress, and vapor formation; the pump must remain within its permitted suction conditions. | Requires stable liquid supply and adequate suction conditions; vapor in the inlet can reduce performance or interrupt operation. | Evaluate net positive suction head, tank pressure, line losses, insulation, cooldown, and vapor return or boil-off handling as a complete system. |
| Sealing and leakage control | Submerged designs can avoid a conventional dynamic shaft seal at the pump casing boundary, depending on the specific construction. | Dynamic sealing at cryogenic temperature needs careful selection, installation, monitoring, and maintenance; sealless designs have different limits and service requirements. | Uses reciprocating sealing components and valves that require inspection and maintenance; leakage collection and detection should be planned. | Set the allowable leakage philosophy and specify gas detection, drain or collection provisions, isolation, and maintenance access in accordance with the project hazard assessment. |
| Cryogenic materials | Common wetted-material choices include austenitic stainless steels and other materials qualified for the design temperature and service. | Wetted casing, impeller, shaft, and seal materials must retain suitable properties at LNG service temperature. | Wetted cylinders, valves, plungers, and seals require material qualification for cryogenic liquid and the specified pressure. | LNG is typically near its atmospheric boiling point of about −162 °C; specify materials using the actual minimum design temperature, pressure, and applicable codes. Avoid unqualified ordinary carbon steel in cryogenic service. |
| Floating-unit motion | Assess tank location, pump submergence, sloshing, liquid-level variation, and the effects of vessel motion on reliable operation. | Deck-mounted equipment and connected piping must accommodate vessel motion, vibration, and changing loads without imposing excessive nozzle forces. | Reciprocating forces and discharge pulsation can interact with floating-structure motion and piping vibration. | Use the station’s motion and acceleration criteria in equipment supports, piping flexibility analysis, vibration assessment, and operating limits. |
| Skid arrangement | May require a tank-mounted or tank-integrated arrangement, with accessible electrical connections, lifting provisions, and a maintainable removal path. | Can be arranged with pump, motor, suction and discharge piping, instruments, and local isolation on a deck skid. | Usually needs a rigid support structure, space for drive and maintenance access, and measures to control pulsation in connected lines. | Provide clear access for inspection and removal, defined lifting points, cryogenic pipe supports, thermal-contraction allowance, drainage, and segregation of operating and maintenance areas. |
| Controls and protection | Typical provisions include motor protection, level or permissive interlocks, temperature monitoring where required, and suitable start-up logic. | May require seal or bearing monitoring, motor protection, suction and discharge pressure indication, and minimum-flow protection as applicable. | May require pressure protection, stroke or speed control, pulsation monitoring, and safeguards for blocked discharge or loss of suction. | Define alarms, trips, emergency shutdown interfaces, isolation logic, hazardous-area electrical requirements, and control-system interfaces during the design phase. |
| Maintenance considerations | Maintenance may involve lifting equipment from the tank or well; verify access, isolation, draining, and safe handling procedures. | Deck access can simplify inspection, but cryogenic seals and rotating components may require specialized procedures and planned spares. | Plan access to valves, seals, and reciprocating components; include inspection intervals and suitable provisions for managing pulsation-related wear. | Compare total lifecycle needs, including planned downtime, lifting arrangements, spare parts, technician access, and the station’s operating profile. |
| Best-fit decision | Consider when steady transfer duty and an appropriate submerged installation are priorities. | Consider when a deck-mounted centrifugal arrangement fits the suction, sealing, and maintenance requirements. | Consider when the process requires higher liquid discharge pressure and the resulting flow and maintenance profile are acceptable. | Confirm the final choice through process calculations, pump-vendor performance data, hazardous-area review, motion assessment, and applicable marine and pressure-system codes. |