Choosing a microgrid begins with a clear question: what must keep working when the utility supply fails? List essential services, such as refrigeration, medical equipment, communications, pumps, and emergency lighting. Start with the outage.
The U.S. Energy Information Administration reported an average of 5.6 hours of electricity interruptions per customer in 2023, including major events. That national average is useful context, not a local design target. Weather, fuel access, and utility restoration times differ by site.
Map critical loads by location, operating hours, and starting demand. A pump may draw far more power at startup than during steady operation. Separate must-run equipment from loads that can pause, then estimate how long each must operate independently.
Not every load matters equally. Set resilience goals in practical terms: hours or days of islanded operation, acceptable service interruptions, and recovery priorities. The U.S. Department of Energy’s microgrid guidance emphasizes defining performance requirements early; otherwise, systems can be oversized or fail to protect the loads that matter most.
A facility walk-through can expose overlooked details, like a network closet sharing a circuit with noncritical offices. Some assumptions will be wrong. Record them, test them against operating staff’s experience, and revise the load plan before sizing generation and storage.