| Payload | Maximum part weight plus gripper, sensors, cables, and any other tool mounted on the robot. | A 12 kg part with a 4 kg tool requires at least 16 kg of payload capacity before checking the robot’s load limits at the required reach. | Check the manufacturer’s payload chart, wrist moment limits, and center of gravity—not just the headline payload rating. |
| Robot reach and work height | Farthest and highest or lowest points the robot must reach, including approach angles and obstacles. | A tending task spanning two machines may require the robot to reach both machine openings and maintain clearance around fixtures. | Map the full robot work envelope. A 7th axis extends the robot’s base position along a track; it does not remove the robot’s reach or joint-limit constraints. |
| Track travel and usable stroke | Distance between the robot’s required working positions, plus allowance for end stops, clearance, and service access. | For workstations spread across a 6 m line, the required usable travel depends on robot reach from each stopping position and the location of the track ends. | Lay out station coordinates and verify each task position in simulation. Do not assume the required rail length equals the distance between stations. |
| Cycle time and travel speed | Required parts per hour, robot task time, track moves, loading time, and time available for each operation. | A target of 60 completed parts per hour allows an average of 60 seconds per part, before accounting for breaks, changeovers, and planned downtime. | Request a cycle-time study with acceleration, stopping, settling, and robot motion included. Maximum track speed alone does not predict throughput. |
| Positioning and process accuracy | Required placement tolerance at the workpiece, repeatability, fixture variation, and whether vision or probing is used. | Machine tending may tolerate fixture-guided loading, while precision assembly may need tighter process control and a validated calibration method. | Specify tolerance at the task location. Evaluate the combined robot, track, tooling, fixture, and calibration performance rather than a single component rating. |
| Work sequence and station layout | Station order, robot stopping points, part handoffs, operator access, and whether tasks can run in parallel. | A robot serving three machines may need separate programmed positions and a defined path that avoids doors, fixtures, and operator areas. | Draw a scaled layout and document every handoff. Check whether a single robot can meet throughput without creating a bottleneck. |
| Track mounting and floor conditions | Floor flatness, anchoring, foundation capacity, rail alignment, and available installation space. | A long travel axis may need a prepared foundation and alignment checks to maintain performance over its full length. | Have the supplier specify foundation and installation tolerances, anchoring, leveling, and alignment requirements for the site. |
| Controls and integration | Robot and track control compatibility, machine signals, safety interfaces, programming, and recovery procedures. | An automated cell may require coordinated robot-and-track motion, machine-ready signals, door interlocks, and fault recovery logic. | Define control ownership, communication signals, safety responsibilities, and commissioning scope before finalizing the system design. |
| Environment and safety | Dust, coolant, temperature, washdown, pinch points, access routes, and interaction with people. | A track near machining equipment may be exposed to chips or coolant and may need guarding or protective measures suited to the environment. | Assess the complete cell through a site-specific risk assessment. Select guarding and safety functions for the application and applicable regulations. |
| Future expansion and maintenance | Potential new stations, spare travel, service access, lubrication, inspection intervals, and replacement-part availability. | A planned line extension may justify reserved floor space or track capacity, even if the initial installation serves fewer stations. | Compare initial cost with expansion and maintenance needs. Confirm service access and maintenance tasks can be performed safely. |