| Cargo classification | Confirm the exact LPG composition and shipping description. Common UN entries include UN 1075 (petroleum gases, liquefied), UN 1965 (hydrocarbon gas mixture, liquefied, n.o.s.), UN 1978 (propane), and UN 1011 (butane). | Classification depends on the actual product and applicable dangerous-goods rules. Do not select a tank from the generic term “LPG” alone. | Current safety data sheet, product specification, and shipper’s dangerous-goods classification. |
| Tank type and approval | Check that the portable tank is approved for the specific gas and transport mode. LPG is commonly carried in a pressure tank designed and approved under the applicable portable-tank requirements, often identified as a T50 tank where permitted. | The tank instruction, approval scope, and permitted substance list must match the cargo and route. A tank suitable for one gas or regulation may not be suitable for another. | Tank data plate, type-approval certificate, applicable UN/IMDG or other transport documentation, and permitted-substance information. |
| Design pressure and temperature | Compare the tank’s marked design pressure and temperature range with the cargo’s properties, anticipated ambient conditions, and operating requirements. | LPG pressure varies with composition and temperature. The tank’s approved design limits—not a general rule of thumb—determine suitability. | Data plate, design/type-approval documents, and product pressure-temperature information. |
| Periodic inspection status | Review the inspection and test dates, due dates, and results required by the tank’s approval and governing regulations. UN portable-tank rules commonly include periodic and intermediate inspections, with intervals depending on the applicable provisions. | An expired, incomplete, or failed inspection can make a tank unacceptable for transport. Confirm the exact interval and required tests for the specific tank and jurisdiction. | Inspection reports, test certificates, tank markings, and maintenance or repair records. |
| Condition and leak checks | Inspect the shell, frame, weld areas, valves, fittings, closures, pressure-relief devices, and protective covers for damage, corrosion, contamination, leakage, or missing parts. Complete required leak tests and pre-use checks. | Visible defects or faulty closures can compromise containment. Suspected damage or leakage requires the tank to be taken out of service and assessed by qualified personnel. | Documented pre-loading inspection, leak-test records where required, and defect-resolution records. |
| Valves and pressure-relief devices | Verify that the valves, fittings, and pressure-relief devices are the approved type, correctly fitted, unobstructed, protected, and within inspection or maintenance requirements. | These components are critical to safe containment and pressure control. Never block, alter, or bypass a pressure-relief device. | Equipment identification and maintenance records, inspection findings, and approval documentation. |
| Material compatibility and cleanliness | Confirm compatibility of the tank, seals, valve materials, and previous cargo residues with the LPG being loaded. Ensure the tank is in the required clean, dry, and serviceable condition. | Compatibility and contamination requirements depend on product specification and operating procedures. Previous cargo history may affect acceptance. | Previous-cargo record, cleaning or gas-freeing documentation where applicable, and cargo acceptance criteria. |
| Maximum filling limit | Determine the allowable filling quantity using the approved filling ratio or degree of filling for the specific gas, tank, and loading temperature. Account for liquid expansion and the applicable transport rules. | There is no single safe fill percentage for every LPG tank and cargo. Never exceed the approved limit; use calibrated weighing or filling controls as required by the procedure. | Approved tank/cargo filling limits, product data, loading calculation, and calibrated scale or measurement records. |
| Loading operations | Use trained personnel and an approved loading procedure. Verify connections and transfer equipment, control ignition sources, follow site requirements for bonding or grounding, monitor the transfer, and close and secure all openings afterward. | LPG is a flammable gas. Site-specific controls, equipment design, and applicable safety rules govern the operation; do not improvise connections or procedures. | Loading checklist, operator authorization, equipment inspection records, and completed transfer documentation. |
| Transport marks and documents | Check that required tank markings, placards, labels, shipping papers, and emergency information are complete and consistent with the declared cargo and route. | Requirements vary by mode, jurisdiction, and cargo classification. Verify against the current rules for every leg of the shipment. | Dangerous-goods transport documents, emergency contact details, placard/marking check, and route-specific compliance review. |
| Final selection decision | Select a tank only when its approval, cargo compatibility, pressure rating, inspection status, fittings, capacity, and route requirements have all been verified. | For cross-border or multimodal transport, confirm requirements with the competent authority, qualified dangerous-goods professional, or other responsible technical authority. | Completed compliance review and confirmation that the current applicable regulations and tank-specific instructions have been followed. |