| Product and dosage form | Product type, physical condition, and whether products are weighed individually or in groups. | Tablets in a bottle, a blister pack, a sachet, or a carton containing multiple units. | Product size, movement, and orientation affect how the item transfers across the weighing platform. |
| Target weight and range | Nominal package weight, permitted operating range, and the smallest weight difference that must be detected. | Record the typical net content and the minimum and maximum gross weights of the finished pack. | The selected weighing range and scale division should suit the actual product rather than relying on a single headline accuracy figure. |
| Packaging format | Pack material, dimensions, shape, closure, and whether packs are rigid, flexible, or unstable. | Rigid cartons generally convey differently from flexible pouches; tall bottles may need extra guidance. | Packaging affects conveyor handling, product spacing, weighing stability, and rejection design. |
| Line speed and spacing | Required throughput in packs per minute and the available gap between consecutive packs. | Specify normal and peak production rates, including expected changes during product or format changeover. | Actual weighing performance depends on product flow, spacing, vibration, and the time available for each measurement. |
| Weighing performance | Required measurement repeatability and the acceptable false-reject and missed-reject risk. | Confirm performance using representative products and the intended production speed during a site acceptance test. | Performance should be verified under real operating conditions; it can vary with pack type, speed, and installation. |
| Reject system | Reject method, reject confirmation, collection arrangements, and response to a reject-system fault. | Choose a method suitable for the pack and line speed, and define how rejected packs are secured and reconciled. | Confirmed removal helps prevent underweight or otherwise out-of-limit packs from continuing downstream. |
| Product changeovers | Number of pack formats, recipe management, tool-free adjustment needs, and changeover frequency. | Define the number of product recipes and identify components that must be changed or cleaned between runs. | Clear settings and repeatable changeovers reduce setup errors and unplanned downtime. |
| Cleaning and hygiene | Cleaning method, exposure to dust or washdown, contact-material requirements, and required access for cleaning. | Assess whether the process needs dry cleaning, damp cleaning, or a defined washdown capability. | The equipment design and ingress protection should match the documented cleaning procedure and production environment. |
| Data and traceability | Required records, user access, batch or lot association, data export, and integration with line-control systems. | List the records needed for production review, investigations, and applicable electronic-record controls. | Defined data needs help ensure that measurements and operator actions can be reviewed and retained appropriately. |
| Regulatory and quality requirements | Applicable markets, product type, company quality procedures, and relevant legal metrology or GMP obligations. | Confirm requirements with the quality and regulatory teams; requirements depend on jurisdiction and intended use. | A checkweigher does not by itself establish regulatory compliance. Qualification, procedures, and records may also be required. |
| Qualification and calibration | Acceptance criteria, installation and operational checks, calibration approach, and ongoing performance checks. | Define test weights or challenge checks, test frequency, acceptance limits, and responsibilities in approved procedures. | Documented, risk-based qualification and routine checks help demonstrate that the equipment remains fit for its intended use. |
| Installation and support | Available footprint, conveyor height, electrical supply, interfaces, service access, and maintenance response needs. | Review the line layout and utilities before installation, including the space needed for reject collection and safe access. | Early checks reduce integration problems and help maintain reliable production and serviceability. |