| Wind resource | Long-term wind speed and direction measured or modeled at the proposed turbine hub height. Utility-scale sites are often assessed around 6.5–7 m/s or higher, but suitability depends on the turbine and project economics. | Wind speed strongly affects annual energy production, revenue, and project viability. | Review at least a year of on-site measurements where practical, correlated with long-term weather records; assess turbulence, terrain, and uncertainty. |
| Expected capacity factor | Many onshore projects fall broadly around 25–45%; offshore projects commonly fall around 35–55%. Actual results depend on site conditions, turbine design, and curtailment. | A higher capacity factor generally means more electricity produced from each installed kilowatt. | Request an independent energy-yield assessment, including losses from wakes, electrical systems, availability, environmental limits, and grid curtailment. |
| Installed project cost | Utility-scale onshore wind costs can vary substantially by country, site, project size, and year. A preliminary planning range may be about US$1,300–2,200 per kW, excluding unusual grid or site costs. | Upfront capital cost affects financing needs, levelized cost of energy, and returns. | Confirm what the estimate includes: turbine, foundations, roads, installation, development, interconnection, taxes, and contingency. Obtain site-specific bids. |
| Operations and maintenance | Costs vary with turbine age, access, service contracts, location, and spare-parts requirements; there is no universal annual cost applicable to every project. | Maintenance affects lifetime costs, turbine availability, and the amount of electricity sold. | Compare full-service and owner-managed plans, warranty coverage, major-component exclusions, response times, and expected costs over the project life. |
| Turbine availability | Technical availability targets are often in the mid-to-high 90% range, but contractual definitions and exclusions differ. | Downtime reduces generation and can delay revenue, especially during periods of strong winds. | Check the availability guarantee, measurement method, compensation limits, excluded events, and the service provider’s track record. |
| Project lifetime | Wind projects are commonly planned around a 20–25-year operating life; actual life depends on design, maintenance, and site conditions. | Longer operation can spread initial investment over more years, but may require component replacement or refurbishment. | Review the turbine design life, warranty term, end-of-life obligations, decommissioning plan, and potential repowering costs. |
| Grid connection and curtailment | There is no general cost benchmark: distance to the grid, network capacity, upgrades, and connection rules determine the project-specific impact. | A viable wind site may still face high connection costs or limits on how much electricity it can export. | Obtain a grid-impact study, connection-cost estimate, export limit, curtailment history or forecast, and a clear allocation of upgrade costs. |
| Revenue and electricity price | Revenue may come from a power purchase agreement, a regulated tariff, or wholesale-market sales; prices and contract terms vary by market. | More predictable revenue can support financing, while market exposure can increase returns as well as risk. | Assess contract duration, pricing structure, counterparty credit, settlement rules, imbalance charges, and exposure after the contract ends. |
| Permits and environmental constraints | Requirements are site-specific and may include land-use approval, aviation review, noise limits, and wildlife assessments. | Delays, operating restrictions, or denied permits can change project cost and expected output. | Confirm land rights, permitting status, community engagement needs, protected-species surveys, shadow-flicker limits, and required setbacks. |
| Financing and investment returns | Evaluate project cash flow using the proposed debt terms, taxes, incentives, energy yield, operating costs, and a range of electricity-price scenarios. | Returns depend on the combined effect of resource quality, costs, financing, and revenue—not on turbine output alone. | Test downside cases for lower wind production, higher interest rates, construction delays, cost overruns, and reduced power prices; review lender covenants and reserve requirements. |