| 1. Material types | List every substrate, including its composition, coating, surface sensitivity, and whether it is supplied as film, paper, foil, or laminate. | Flexible packaging film, paper, and laminated webs, assessed separately for handling and tension needs. | Material properties affect web tension, knife selection, winding quality, and the risk of stretching, wrinkles, or surface marks. |
| 2. Web width and thickness | Record the minimum and maximum incoming web width, thickness range, and required slit widths. | Incoming web width: 1,000–1,600 mm; finished slit widths: 100–500 mm. | The machine must accommodate the widest parent roll and the narrowest slit without compromising setup or finished-roll quality. |
| 3. Roll dimensions and weight | Specify maximum parent-roll diameter and weight, core inside diameters, and finished-roll diameter limits. | Parent roll: up to 1,000 mm diameter; finished rolls: up to 600 mm diameter; core sizes confirmed from customer specifications. | These limits determine whether the unwind, rewind, shafts, and roll-handling equipment can safely manage your work. |
| 4. Output goals | Set a realistic target in finished rolls, square metres, or tonnes per shift, and include scheduled operating hours. | Target: 30,000 m² per 8-hour shift, with planned time reserved for setup, splicing, inspection, and roll changes. | Rated line speed alone does not equal daily output. Usable production time and job mix must be included in capacity estimates. |
| 5. Slitting method and quality | Identify the required slit method and define acceptable edge condition, width tolerance, dust, and roll hardness. | Choose a suitable shear, razor, or crush-cut arrangement after trials; set width tolerance and edge-quality criteria for each product. | Different materials and quality requirements call for different tooling and adjustment practices. Sample testing helps verify the result. |
| 6. Changeovers and product mix | Estimate the number of jobs, slit patterns, and material changes per shift; note how often knife positioning and cores must be changed. | Six job changeovers per shift, with a planned setup-time target established from current production records. | Frequent changeovers can reduce effective output. Setup features and accessible adjustments may be important when job variety is high. |
| 7. Staffing, safety, and future capacity | Define operator availability, loading and unloading method, required guarding, and expected production growth. | One trained operator per shift where the workflow and risk assessment allow; review assisted handling and a 20% capacity allowance for growth. | Staffing and safe roll handling affect workflow, while a reasonable growth allowance can help avoid an early capacity bottleneck. |