| 1. Match the machine to the casting process | Confirm that the machine is designed for the intended aluminium alloy, part geometry, production volume, and cold-chamber process requirements. | Which alloys and part types has this machine configuration been designed to run? Are the shot sleeve, plunger, and other melt-contact components suitable for the intended operating conditions? | Written process proposal listing the alloy range, machine configuration, and any application limits. | Aluminium die casting commonly uses cold-chamber machines. Process compatibility affects component wear, process stability, and achievable production results. |
| 2. Verify clamping force and die fit | Check required clamping force, platen dimensions, tie-bar spacing, die thickness range, and opening stroke against the actual die and casting layout. | Has the supplier reviewed the projected area and process assumptions used for the clamping-force recommendation? Will the complete die fit and open sufficiently for the part and ejector system? | Calculation assumptions, machine layout drawing, platen dimensions, and a die-fit review. | Insufficient clamping capability can contribute to die separation and flash. A machine that cannot accommodate the die may require costly redesign or limit future work. |
| 3. Check shot capacity and shot configuration | Compare the usable shot capacity and shot-end configuration with the casting, runner, overflow, and biscuit requirements. | What shot size and operating range are recommended for the complete shot? How do sleeve diameter, fill level, and available shot profile control affect the proposed process? | Shot-weight calculation, shot-end specifications, and a proposed starting process window. | Shot capacity must suit the whole shot, not only the finished casting. A suitable operating range helps avoid an impractical process setup. |
| 4. Assess machine safety features | Review guarding, access doors, interlocks, emergency stops, hydraulic and electrical isolation, and safe access for die changes and maintenance. | Can hazardous machine motion be prevented when guards are open? Are safety circuits and access arrangements documented for the intended installation and local requirements? | Safety documentation, risk-assessment information, guarding layout, and commissioning safety-check procedure. | Die casting involves high clamping forces, hot metal, and moving equipment. Safety provisions should be reviewed for the complete machine and its installation, not just individual components. |
| 5. Evaluate control and process monitoring | Check shot-profile control, process data access, alarm history, recipe management, and the available monitoring options. | Which process variables can operators set and review? Can approved settings be stored, compared, and protected from unintended changes? | Control-system specification, sample process report, and a demonstration using a representative setup. | Clear process records can support repeatability, troubleshooting, operator training, and production-quality investigations. |
| 6. Confirm expected production performance | Evaluate cycle-time assumptions, uptime expectations, changeover needs, and the machine’s ability to run the intended part and die. | Are quoted cycle times based on a comparable die, alloy, cooling arrangement, and automation level? What operations are included or excluded? | Written assumptions for any cycle-time estimate and, where practical, a production trial or acceptance-test plan. | Machine speed alone does not determine output. Die cooling, part handling, operator tasks, and process stability also affect production rate. |
| 7. Review supplier support and training | Assess installation, commissioning, operator and maintenance training, remote assistance, service availability, and response arrangements. | Who will install and commission the machine? What training is included, and how are service requests handled during and after the warranty period? | Scope of supply, training agenda, service terms, support contact process, and commissioning responsibilities. | Good support helps the plant install the machine correctly, develop operating skills, and reduce avoidable delays during startup or troubleshooting. |
| 8. Check spare-parts availability and maintainability | Review recommended critical spares, service access, maintenance intervals, consumables, and parts lead times. | Which parts are considered critical for the planned operating schedule? Are maintenance tasks accessible, documented, and supportable by the plant team? | Recommended spare-parts list, maintenance schedule, parts identification information, and stated supply arrangements. | Parts availability and maintainable design can affect downtime. Include routine wear items as well as less frequent replacement parts in planning. |
| 9. Calculate total cost of ownership | Compare purchase and installation costs with utilities, maintenance, spare parts, tooling interfaces, training, downtime, and expected service life. | Which costs are excluded from the quotation? What site services, foundations, cooling, extraction, automation, or commissioning work will be required? | Itemized quotation, installation requirements, utility data, maintenance assumptions, and a multi-year cost comparison using the same scope. | The purchase price is only one part of the investment. Consistent assumptions make it easier to compare the likely cost of operating each option. |
| 10. Plan for installation and future needs | Check floor space, machine height, access routes, foundation requirements, electrical supply, cooling, extraction, and room for future production needs. | Has the supplier provided site-preparation drawings and utility requirements? Can the proposed layout accommodate die handling, peripherals, maintenance access, and planned expansion? | General arrangement drawing, foundation and utility specifications, delivery plan, and site-readiness checklist. | Early site planning helps prevent installation delays and ensures there is sufficient space and infrastructure for safe operation and supporting equipment. |