| 1. Set the required daily throughput | Specify the mass of whole or prepared tires the plant must process per operating day. State whether the figure is a design rating or a guaranteed sustained feed rate. | 10 metric tonnes per day of incoming tires. | A quoted capacity may refer to nominal reactor capacity, feed capacity, or output capacity. Compare quotes using the same feed-rate basis and feedstock condition. |
| 2. Convert daily capacity to annual throughput | Calculate annual feed as daily throughput multiplied by planned operating days per year. Keep planned shutdowns and maintenance in the operating-day assumption. | 10 t/day × 300 operating days/year = 3,000 t/year. | Annual throughput helps compare equipment sized for different operating schedules. Do not compare annual figures that assume different numbers of operating days. |
| 3. Define the operating schedule and availability | Record shifts per day, hours per shift, days per week, planned maintenance, and expected operating availability. Ask suppliers to state the assumptions behind rated capacity. | A plant planned for one 8-hour shift has a different hourly feed-rate requirement from a plant targeting the same daily tonnage over 24 hours. | Operating hours affect the required feed system, reactor configuration, labor plan, and maintenance provisions. Rated capacity alone does not establish actual annual production. |
| 4. Specify the tire feedstock | Describe tire types, size range, contamination, moisture, and whether tires arrive whole, cut, or shredded. Clarify whether bead wire or other components are removed before feeding. | Mixed end-of-life passenger and truck tires, with the delivery condition and any pre-processing stated in the request for quotation. | Feed preparation requirements can add equipment, labor, power use, floor space, and maintenance. Capacity claims may also depend on the assumed tire size and preparation. |
| 5. Separate plant capacity from product yield | Request product-yield assumptions separately from tire throughput. Identify the basis of each yield figure and the expected product specifications and quality controls. | For a 10 t/day feed rate, ask suppliers to report expected product quantities per tonne of the specified tire feedstock, rather than treating product output as feed capacity. | Yields vary with feedstock, process conditions, and measurement basis. A yield claim is not a substitute for a clearly defined and verifiable feed-throughput guarantee. |
| 6. Compare the same equipment and project scope | List included and excluded items: tire preparation, feeding and discharge, reactor, gas handling, emissions controls, product cooling, storage, controls, installation, commissioning, and operator training. | Mark each item as included, excluded, or supplied by the buyer in every quotation. | A lower equipment price may exclude auxiliaries, site work, or commissioning. A like-for-like scope comparison prevents omitted items from being mistaken for savings. |
| 7. Confirm site utilities and cost basis | Document available electricity, fuel, water, drainage, land, and building conditions. Record the quotation currency, delivery terms, taxes, installation boundary, and validity period. | Compare all offers in the same currency and on the same stated delivery and installation basis; list site-specific works separately. | Utility upgrades, civil works, transport, duties, and installation may sit outside the equipment price. These differences can materially change the total project budget. |