| 1 | Product and application fit | 15% | Confirm the manufacturer produces the required cable type, voltage class, conductor material, insulation, sheath, and operating-temperature range for the intended industrial application. | Product datasheets, construction drawings, ratings, and a written response against the project specification. |
| 2 | Standards and regulatory compliance | 15% | Check that the offered design meets the standards and market requirements specified for the project. Relevant examples include IEC 60228 for conductor classes and IEC 60502 for power cables within its stated voltage scope. | Applicable conformity documents, standard editions, declarations, and reports for the exact cable design being quoted. |
| 3 | Type testing and product verification | 12% | Assess whether the proposed construction has been tested for the required electrical, mechanical, and environmental properties. Fire-performance requirements should be matched to the project specification. | Complete test reports identifying the tested cable construction, test methods, results, date, and issuing laboratory. |
| 4 | Quality management and process control | 12% | Review controls for incoming materials, conductor processing, insulation and sheathing extrusion, in-process inspection, final testing, nonconformities, and corrective actions. | Current quality-management certificates, process-control plans, inspection records, and audit findings relevant to the production site. |
| 5 | Laboratory and routine testing capability | 10% | Verify that the factory can perform the routine and sample tests required by the applicable standard and contract, and can control calibration of test equipment. | Laboratory equipment list, calibration records, sample test certificates, and testing scope where external laboratories are used. |
| 6 | Material traceability and documentation | 10% | Check whether production batches can be linked to material records, inspection results, cable markings, reel identification, and shipment documents. | Sample batch-traceability pack, material certificates where specified, inspection and test plan, and reel schedule. |
| 7 | Engineering and customization support | 8% | Evaluate the ability to review specifications, resolve technical deviations, prepare construction details, and manage approved design changes. | Technical query responses, deviation list, controlled drawings, and documented change-approval process. |
| 8 | Production capacity and delivery planning | 7% | Compare the requested quantities, conductor sizes, cable lengths, reel dimensions, and delivery schedule with the factory’s confirmed production plan. | Order-specific lead time, capacity confirmation, production milestones, packaging plan, and shipment schedule. |
| 9 | Export readiness and logistics | 6% | Confirm the supplier can prepare the required commercial and technical documents, protect cable drums for the transport route, and coordinate shipment terms agreed in the contract. | Sample packing list, commercial invoice format, certificate documentation plan, drum and packing specifications, and proposed shipping schedule. |
| 10 | After-sales service and commercial transparency | 5% | Review response arrangements for technical questions, claims, warranty matters, and replacement or corrective-action requests. Compare quotations on the same technical and delivery basis. | Written warranty terms, claim procedure, named service contacts, itemized quotation, and stated exclusions. |