| Quality management system | 15% | A documented, implemented quality system and its relevance to the production site and supplied parts. | Current certificate and scope for the manufacturing site; check certification status with the issuing body. IATF 16949 is an automotive quality management system standard; ISO 9001 may also be relevant. |
| Machining capability and process fit | 15% | Fit between the required material, part geometry, size, features, surface finish, and the supplier’s CNC processes. | Review relevant machine and process lists, sample parts, tooling plans, and a capability study for drawing-critical features. Confirm tolerances part by part rather than relying on a general claim. |
| Inspection and measurement | 10% | Availability of suitable inspection methods for dimensional, geometric, and surface requirements. | Equipment list, sample inspection reports, measurement plans, and calibration records. Where relevant, check whether external calibration is performed by an appropriately accredited laboratory. |
| Traceability and change control | 10% | Ability to link production lots to material, process, inspection, and shipment records, and to control engineering changes. | Example lot-traveler or traceability records; documented procedures for revision control, nonconforming product, and customer-approved changes. |
| Production capacity and resilience | 10% | Available capacity for forecast demand, bottleneck processes, maintenance planning, and contingency arrangements. | Capacity and lead-time assumptions, production schedule examples, equipment-maintenance plan, and a documented business-continuity or recovery plan. |
| Material control | 8% | Control of material grades, approved sources, incoming inspection, and material identification throughout production. | Material certificates or test reports as specified, incoming-inspection records, and evidence that grade and heat or lot identification are maintained where required. |
| Automotive launch documentation | 8% | Readiness to support customer-required planning, risk analysis, validation, and production-part approval activities. | Relevant examples of control plans, process flow diagrams, risk analyses, and measurement results. APQP and PPAP submissions are subject to customer and program requirements. |
| Delivery performance | 7% | Performance against agreed lead times, shipment schedules, packaging specifications, and escalation requirements. | Recent on-time delivery records, stated lead-time assumptions, packaging samples, and procedures for communicating delays. |
| Total cost and quotation transparency | 7% | Quoted price in relation to material, machining, finishing, inspection, packaging, tooling, logistics, and expected order volume. | Itemized quotation, assumptions on annual volume and order quantities, tooling ownership terms, and clearly stated shipping and payment terms. |
| Communication and engineering support | 5% | Responsiveness and ability to discuss manufacturability, drawing interpretation, process risks, and corrective actions. | A sample design-for-manufacturing review, named technical contacts, response-time expectations, and examples of documented corrective-action follow-up. |