| Product and coating scope | Clearly defined pipe sizes, substrate specifications, coating type, service conditions, and whether the coating is for external protection, internal lining, or both. | Project specification and applicable product standard. ISO 21809-2 covers external FBE coatings for buried or submerged pipelines; AWWA C213 covers fusion-bonded epoxy coatings and linings for steel water pipe and fittings. | Compare the quotation and technical data sheet with the project specification; confirm that the standard’s scope matches the intended application. |
| Manufacturing capability | Documented control of surface preparation, preheating, powder application, curing, handling, and coating repairs. Capacity and permitted pipe dimensions should be stated rather than assumed. | Process flow, equipment list, capacity statement, work instructions, and production records for the relevant pipe range. | Request a process audit or live production demonstration and verify that the proposed line can handle the ordered pipe dimensions and coating requirements. |
| Surface preparation | Recorded abrasive-blasting parameters and inspection of cleanliness and surface profile before coating; contamination and flash rust should be controlled. | Project specification and the referenced coating standard; inspection records should identify the method, acceptance criteria, and results. | Review preparation procedures and sample inspection reports, and confirm the acceptance criteria before production begins. |
| Coating thickness | Measured coating thickness with defined sampling locations, instrument checks, and documented acceptance against the applicable specification. | ISO 21809-2, AWWA C213, or the project specification, as applicable. ASTM D7091 describes nondestructive measurement of dry-film thickness on ferrous metals. | Check calibrated-instrument records, inspection frequency, and actual readings on production reports; use the project’s specified limits. |
| Holiday and continuity testing | Inspection for coating discontinuities using a suitable detector, with voltage and test procedure selected for the coating system and thickness. | Applicable product standard and project procedure. ASTM G62 describes holiday-testing methods for protective coatings on pipeline materials. | Review detector calibration and test logs; confirm the test method and voltage are appropriate for the specified coating. |
| Adhesion and cathodic disbondment | Type-test or qualification evidence for the specified coating system, plus documented controls for powder identification, storage, and application. | Applicable coating standard and project specification. ASTM G8 provides test methods for cathodic disbonding of pipeline coatings. | Request complete test reports identifying the coating system, test method, specimen, conditioning, results, and acceptance criteria. |
| Inspection and traceability | Traceability linking pipe or production lot to substrate records, coating powder batch, process parameters, inspection results, and repair records. | Inspection and test plan, material records, batch records, nonconformance reports, and final inspection documentation. | Ask for a sample manufacturing record package and check that the traceability fields match the purchase order and marking requirements. |
| Quality management certification | A functioning quality management system relevant to the manufacturing site and scope of work. | ISO 9001 certification is evidence of a certified quality management system; it is not, by itself, product certification or proof that a coating meets a project specification. | Verify the certificate’s validity, issuing certification body, site address, and scope. Confirm product compliance separately. |
| Potable-water suitability | Where the pipe or lining will contact drinking water, evidence that the exact product and intended use meet the applicable health-effects requirements. | NSF/ANSI/CAN 61 addresses health effects of drinking-water system components. Applicability depends on product, use, and market requirements. | Check the certifier’s current listing for the exact coating or product, manufacturing location, and intended conditions of use. |
| Project compliance and delivery | Clear confirmation of deviations, inspection hold points, repair limits, marking, packaging, delivery schedule, and required documentation. | Approved technical submittals, inspection and test plan, purchase order, and project-specific quality requirements. | Resolve exceptions in writing before award; include inspection access and document deliverables in the purchase contract. |