| LNG storage | Cryogenic storage tank, valves, level and pressure instruments, pressure-relief devices | Check the approved layout and required separation distances; confirm tank foundations, access, protection from vehicle impact, instrument functions, and safe relief discharge arrangements. | Approved equipment data, pressure-vessel documentation where applicable, layout drawings, relief-device records, and commissioning test results |
| LNG unloading connection | Unloading pipeline and couplings, isolation valves, grounding or bonding provisions, emergency shutdown interface | Verify secure connections, accessible isolation, clear operating and vehicle arrangements, leak checks, and a documented unloading procedure that addresses abnormal conditions. | Piping and instrumentation diagrams, connection specifications, inspection records, and unloading procedure |
| Cryogenic pumping and pressurization | LNG pump, cryogenic piping, pressure and temperature instruments, isolation and check valves | Confirm equipment pressure and temperature ratings suit the design conditions; check piping supports, valve accessibility, leak-tightness, and safe response to pump or instrument failure. | Design conditions, equipment specifications, pressure or leak-test records, and operating and maintenance instructions |
| Vaporizer and gas conditioning | Ambient-air or other specified vaporizer, outlet temperature and pressure instruments, associated safety devices | Check capacity against the design duty, installation clearances and ventilation, instrument alarms, and protection against operation outside specified temperature or pressure limits. | Capacity calculations, equipment data, instrument calibration records, and functional test results |
| High-pressure storage and piping | CNG storage cylinders or other approved storage equipment, manifolds, high-pressure piping, pressure-relief devices | Verify design pressure, approved arrangement, protection from impact and unauthorized access, relief-device discharge provisions, and required pressure-equipment documentation and inspections. | Design and equipment records, applicable registration or inspection documents, pressure-test records, and maintenance plan |
| CNG dispenser and filling hose | Dispenser, meter, hose, nozzle, breakaway device, emergency stop | Check rated pressure and compatibility, hose and nozzle condition, leak integrity, metering requirements, emergency-stop operation, and safe vehicle positioning. | Equipment specifications, metrology documentation where applicable, hose inspection records, and functional test records |
| Emergency shutdown system | Emergency-stop stations, shutdown valves, control logic, power-loss response | Confirm emergency stops are identifiable and accessible, shutdown actions match the approved design, and cause-and-effect functions are tested, including relevant power or signal failures. | Cause-and-effect matrix, control drawings, functional test records, and emergency response procedure |
| Gas detection and alarms | Combustible-gas detectors, alarm indicators, control and monitoring equipment | Check detector locations against the design and credible leak points; verify alarm indication, calibration, fault reporting, and any linked shutdown functions. | Detector layout, calibration certificates or records, alarm test results, and maintenance instructions |
| Electrical safety and hazardous areas | Electrical equipment, wiring, bonding and earthing system, hazardous-area equipment | Check equipment selection against the approved hazardous-area classification; verify bonding and earthing continuity, electrical protection, and inspection of relevant installations. | Hazardous-area drawings, equipment certificates where required, electrical inspection records, and continuity test results |
| Fire protection and site layout | Fire protection facilities, access routes, signs, barriers, and emergency access provisions | Check fire-protection provisions and facility layout against the approved design and applicable GB 50156-2021 requirements; verify that access, escape, and emergency response routes remain unobstructed. | Approved general arrangement, fire-protection design documents, inspection records, and site acceptance documentation |
| Piping, valves, and leak testing | Process piping, fittings, isolation valves, supports, and pressure-test points | Confirm materials and pressure ratings match the approved design; review installation, inspection, pressure or leak testing, identification, and isolation arrangements. | Piping specifications, welding and inspection records where applicable, test reports, and as-built drawings |
| Operations and maintenance readiness | Operating procedures, emergency plans, training records, inspection and maintenance schedules | Confirm personnel responsibilities, routine checks, abnormal-operation response, and emergency drills are documented; set inspection intervals according to applicable regulations, equipment instructions, and the site’s approved procedures. | Controlled procedures, training and drill records, maintenance logs, and equipment inspection plans |