| 1 | Tube and material range | Confirm the supported tube outside diameter, wall thickness, material, temper, and whether the machine handles the buyer’s actual production mix. Ask suppliers to identify any limits by material and size. | A written capacity matrix and sample runs using the specified tube. There is no single universal capacity range for all hairpin applications. | A mismatch can cause scrap, additional tooling, or the need for a second machine. |
| 2 | Bend geometry and quality | Specify centerline bend radius, leg length, bend angle, orientation, end condition, and allowable ovality or wall thinning. Define acceptance limits on the part drawing. | Dimensioned drawings, agreed inspection method, and measured samples from a production-representative trial. | Tighter tolerances may require slower cycles, specialized tooling, or additional inspection. |
| 3 | Tooling and changeover | List included dies, clamps, guides, mandrels if applicable, and spare wear parts. Check how many tube sizes or part families each tooling set supports and how changeovers are performed. | Itemized tooling list, changeover instructions, and a witnessed changeover demonstration. | Tooling, setup labor, and changeover downtime can materially affect cost per part. |
| 4 | Output and uptime assumptions | Ask for cycle-time data for the exact part, including loading, unloading, indexing, and any required handling. Clarify the assumptions behind quoted output and what is excluded. | Timed acceptance run, agreed sample size, and a written definition of good parts per hour. | Realistic output estimates help compare labor, capacity, and cost per accepted part. |
| 5 | Controls and factory integration | Review operator interface, recipe storage, alarms, data export, guarding interlocks, and interfaces required for the buyer’s line. Confirm available languages and remote-support arrangements. | Control-system description, interface list, sample alarm history, and integration responsibility matrix. | Unspecified integration work can add engineering, commissioning, and line-stop costs. |
| 6 | Safety and conformity | Identify the destination market and applicable legal requirements. Review risk assessment, guarding, emergency stops, electrical documentation, and required conformity documentation for the supplied machine. | ISO 12100 provides machinery risk-assessment and risk-reduction principles; IEC 60204-1 addresses electrical equipment of machines. Confirm the applicable edition and local requirements with a qualified compliance specialist. | Missing or unsuitable documentation and safeguards may require retrofit, assessment, or shipment delays. |
| 7 | Quality system and traceability | Check how components are inspected, nonconformities are handled, and machine build records are retained. Verify any claimed certification’s scope and validity rather than relying on a logo alone. | An independently verifiable ISO 9001 certificate can indicate a quality-management system; it does not by itself certify machine performance or product conformity. | Better documentation can reduce incoming inspection effort and support faster problem resolution. |
| 8 | Service, spares, and warranty | Define warranty start date, coverage, exclusions, response times, remote troubleshooting, technician availability, and recommended spare-parts stock. | Written warranty terms, spare-parts list with lead times, service escalation path, and training plan. | Freight, customs, and technician travel can make overseas downtime and service expensive. |
| 9 | Delivery and installation scope | Clarify build lead time, packing, shipment point, unloading, foundations, utilities, installation, commissioning, training, and acceptance-test responsibilities. | A project schedule and an agreed delivery term under Incoterms® 2020, with the named place and scope stated in the contract. | The machine price may exclude freight, insurance, import duties, local handling, installation, or training. |
| 10 | Total cost of ownership | Compare purchase price plus tooling, freight, insurance, duties, installation, training, utilities, labor, maintenance, spares, and expected scrap over the planned service period. | Use the same production volume, operating hours, currency, tax treatment, and evaluation period for every quotation. | TCO = acquisition + logistics + installation + operating + maintenance + quality-loss costs. |