| Product Design and Engineering | Converts the project brief into a fountain design covering basin structure, water flow, pump capacity, access panels, drainage, lighting, and maintenance access. | Technical drawings, 3D files, water-flow specifications, pump requirements, material schedule, and installation drawings. | A coordinated design reduces compatibility problems between the basin, pump, pipework, lighting, and control system. | Approved drawings, bill of materials, sample inspection records, and documented design revisions. |
| Material Selection | Selects materials according to application, climate, water exposure, structural load, appearance, and maintenance requirements. | Material grade, thickness, surface treatment, color reference, corrosion resistance requirements, and approved samples. | Outdoor installations may face rain, ultraviolet exposure, freeze-thaw cycles, chemicals, and continuous water contact. | Material certificates, coating specifications, sample approval, and inspection photographs. |
| Pump and Hydraulic System | Matches pump performance with fountain height, nozzle arrangement, pipe diameter, water volume, filtration, and operating conditions. | Flow rate, total head, power input, pipe size, nozzle type, filtration method, and operating duty. | Incorrect hydraulic sizing can cause weak water effects, excessive energy use, noise, or premature pump failure. | Pump datasheet, hydraulic calculation, factory test, water-pattern test, and electrical test record. |
| Electrical Safety and Controls | Coordinates pumps, underwater or outdoor lighting, timers, control panels, sensors, cables, earthing, and protection devices. | Rated voltage and frequency, ingress-protection requirement, control logic, cable specification, emergency isolation, and wiring diagram. | Water and electricity require controlled installation, suitable enclosures, correct isolation, and protection against moisture. | Wiring diagram, electrical safety test, enclosure rating documentation, grounding test, and installation manual. |
| Regulatory and Market Compliance | Identifies the applicable requirements for the destination market and separates product compliance from installation and site obligations. | Applicable standards, electrical ratings, product test reports, declarations, labeling, manuals, and local installation requirements. | Requirements differ by destination, product configuration, voltage system, public-access conditions, and installation environment. | Independent laboratory reports, technical file, conformity documentation, labels, and destination-market review. |
| Prototype and Sample Validation | Builds prototypes or production samples and verifies dimensions, appearance, water patterns, sound, drainage, access, and assembly. | Approved sample, dimensional report, water-effect test, assembly checklist, defect list, and corrective-action record. | Early validation identifies design problems before tooling, bulk production, packing, and international shipping. | Signed sample approval, inspection checklist, dated test video, and controlled revision history. |
| Quality Control | Defines incoming-material checks, in-process controls, final inspection, leak testing, functional testing, and packing inspection. | Inspection level, acceptance criteria, critical defects, dimensional tolerances, water-leak result, electrical test result, and packing status. | Documented inspection criteria make quality measurable and reduce disputes between buyers, factories, installers, and logistics providers. | Pre-production, during-production, and pre-shipment inspection reports with photographs and corrective actions. |
| Packaging and International Logistics | Plans product separation, moisture protection, shock protection, crate design, spare-part packing, loading, and shipping documentation. | Packed dimensions, gross and net weight, carton or crate count, handling marks, spare-parts list, and agreed Incoterm. | Fountains may combine fragile finishes, heavy structures, pumps, glass, lighting, and small installation components in one shipment. | Packing specification, loading photos, packing list, commercial invoice, transport documents, and damage-prevention procedure. |
| Installation and Commissioning | Provides installation guidance for foundations, leveling, pipe connections, electrical interfaces, water treatment, testing, and commissioning. | Site requirements, foundation loads, connection points, commissioning checklist, water-quality requirements, and operating procedure. | A well-made product can still fail if the site preparation, pipework, electrical work, or water treatment is unsuitable. | Installation manual, site checklist, commissioning report, training record, and as-built documentation. |
| After-Sales Support and Spare Parts | Maintains replacement-parts information and supports troubleshooting for pumps, nozzles, seals, filters, lights, controllers, and valves. | Parts list, exploded drawings, maintenance schedule, troubleshooting guide, warranty terms, and service contact process. | Accessible spare parts can reduce downtime and total lifecycle cost for commercial and public installations. | Spare-parts compatibility list, service manual, warranty procedure, and documented response workflow. |
| Total Cost of Ownership | Evaluates purchase price together with energy use, water treatment, cleaning, consumables, maintenance, replacement parts, freight, and installation. | Equipment cost, estimated power demand, maintenance frequency, consumables, spare-parts pricing, installation scope, and operating assumptions. | A lower initial price does not necessarily mean a lower lifecycle cost when energy, maintenance, downtime, and replacement parts are included. | Cost model, operating assumptions, maintenance plan, energy data, spare-parts quotation, and lifecycle review. |